  • Contract date: January 2004
  • Commissioning: mid February 2006
  • Grand Safety Prize award from « Instituto Mexicano del Seguro Social »

Lafarge Group has entrusted Fives FCB with the turnkey supply and installation of a complete cement plant with a clinker production capacity of 1,500 tpd, at Tula, Mexico.

The construction and commissioning of this plant have been a real success in terms of efficiency, safety and industrial performance as it has been delivered four months ahead of the schedule.

In January 2004, Fives FCB signed a contract with the Lafarge Group for the EPC supply and installation of a complete Greenfield cement plant, with a clinker production capacity of 1,500 tpd, at Tula (State of Hidalgo), about 70 km north of Mexico City.
Equipped with Fives technologies, the plant produced its first clinker in January 2006, and has been operating at full capacity since mid-February 2006 - 4 months ahead of the contractual schedule.

Construction and commissioning of this cement plant have been a real success in terms of efficiency, safety and industrial performance.
The plant has beaten all Lafarge’s previous records for safety. According to data supplied by the group, the number of industrial accidents was 11 times lower than the Mexican national average in the construction sector. The Tula plant thus received the “Grand Safety Prize” from Instituto Mexicano del Seguro Social to reward these results.

With an annual production capacity of 600,000 tpy of grey cement, this cement plant has enabled the Lafarge Group to double its production capacity in Mexico to keep pace with the growth of the Mexican economy.

Related reference

Download

Contact us

Fives FCB

Head Office
Sales Department

France

Phone: + 33 3 20 43 75 01
Fax: + 33 3 20 43 75 13


Brazil

São Paulo

Phone: + 55 11 4195 3098


India

Chennai

Phone: + 91 44 4292 7272
Fax: + 91 44 4292 7282


Russia

Moscow

Phone: + 7 495 745 5647
Fax: + 7 495 775 4840