  • Design and supply
  • (1) Preheater kil and raw mill TGT® filter
  • Engineered and supplied in 6 months


Fives designed and supplied to Argos in Harleyville, South Carolina, (1) TGT® filters for the preheater kiln and raw mill .  The project was executed in 6 months from engineering start to supply on site.  The filter was started up in 2004.

The existing reverse air baghouse was replaced with a state-of-the-art low pressure cleaning, long bag TGT® filter.  Engineering included the complete modeling of the baghouse and duct inlets to insure optimum flow and dust distribution to reduce overall pressure and insure filtration efficiency.

Site installation supervision, start-up and commissioning services were also supplied by Fives to insure the success of the project.

Contact us

Fives FCB

Head Office - Sales
France

Phone: +33 3 20 43 75 01
Fax: +33 3 20 43 75 13


Fives Solios

Head Office - Sales
Canada

Phone: +1 (514) 284-1930
Fax: +1 (514) 284-1326


Fives Solios

Sales Office 
US

Phone: +1 (303) 713-0222
Fax: +1 (303) 796-0545