Jorf Lasfar Industrial Complex Phosphate rock grinding plant, B.M.P. (Morocco)

ReferenceJorfLasfar BMP ensemble 02-FIVES

• Contract date: January  2010

• Engineering and supply of a phosphate rock grinding plant

• Commissioning date: September 2011

In 2010, Bunge Maroc Phosphore awarded Fives FCB with a contract for the engineering and supply of a 30 tph phosphate grinding plant to be incorporated into its complete fertilizer production plant at its Jorf Lasfar site, Morocco. 

The contract included engineering in compliance with Spanish and Indian consultant engineers, as well as complete mechanical and electrical/automation equipment such as:

The grinding plant, that started production in September 2011, is operating in full automatic mode for gas flow and temperature regulation.

Contact us

Fives FCB

Head Office
Sales Department

France

Phone: + 33 3 20 43 75 01
Fax: + 33 3 20 43 75 13


Brazil

São Paulo

Phone: + 55 11 4195 3098


India

Chennai

Phone: + 91 44 4292 7272
Fax: + 91 44 4292 7282


Russia

Moscow

Phone: + 7 495 745 5647
Fax: + 7 495 775 4840